Fields of application

• Executed as single pile, contiguous (tangent) or - less often - secant pile wall

• Suitable for high point loads, important horizontal loads and bending moments

• Bearing or embedment in firm strata or hard rock possible

• Obstacle drilling (when other techniques cannot be implemented)

• Important installation depths (up to > 50 m)

• Create piles with a cut-off level beneath the working platform level possible  ("contrebas")

• Infrastructure works, important industrial projects, large buildings.

Environmental impact

• Vibration-free

• Pile with soil extraction: removal of spoil from the job site is required

• Provision should be made to handle the thixotropic fluid

• A stable, dry and flat work platform is required.

Construction sequence

Installation process in accordance with the requirements of standard  NBN EN1536:1999