Techniques :
- 15 no
- Ø 350 mm
- max depth : 12.5 m
To construct a circle slab, using non vibration piling to protect southern water assets using a short mast piling rig due to being located close to a railway track. The preferred piling company had to be FPS member to be able to secure the contract.
Using our Klemm 709 with a short mast to construct 15no 350mm dia piles to a maximum depth of 12.5m. Once the piles were installed blinding and heave protection were placed in readiness for a custom built formwork using ply.
Project name
RTW water storage tank
Category
Municipal Wastewater Treatment Plants
Techniques
Rapid Deck, Sectional Flight Auger (SFA) pile
Contract type
Build
Location
Brighton, United Kingdom
Building Period
2023 - 2023