To construct a circle slab, using non vibration piling to protect southern water assets using a short mast piling rig due to being located close to a railway track. The preferred piling company had to be FPS member to be able to secure the contract.
Using our Klemm 709 with a short mast to construct 15no 350mm dia piles to a maximum depth of 12.5m. Once the piles were installed blinding and heave protection were placed in readiness for a custom built formwork using ply.