Project Ebbsfleet, United Kingdom

Castlehill Ebbsfleet

A new development in Ebsfleet Valley

Sector: Buildings

The new development with provide 10,000 new homes and 20,000 new jobs.

Technical Specifications

Pile Type: CFA piles

Number of Piles: 338no.         

Diameter: 350mm  

Depth: 24.5m

The Challenge

The project required Franki Foundations to construct CFA piled foundation to multiple four-storey apartment buildings for a new town development within Ebbsfleet Valley. The new development will provide 10,000 new homes and is expected to create an estimated 20,000 new jobs. 

The ground conditions consisted of an engineered fill which was used to backfill the old quarry basin. Founding piles into this strata provides both a unique challenge and correct measures of engineering judgement in conjunction with load testing to achieve the required product. 

The Franki Solution

Franki carried out two, three cycle static load tests on expendable piles terminated within the engineered fill in order to evaluate the competency of the engineered fill material, providing data for return and future phases. 

Using the Soilmex SF-50, Franki installed a total of 338, 350mm diameter CFA piles to 24.5m deep. Franki were able to complete the piling works in just five weeks across multiple phases, which allowed for follow on works to start as planned. 

Project details

Project name

Castlehill Ebbsfleet

Category

Residential

Techniques

Continuous flight auger pile (CFA)

Contract type

Build

Location

Ebbsfleet, United Kingdom

Stakeholder(s)

Franki Foundations UK

Building Period

2019 - 2019

Related Projects