Rapid deck

  • 2080 m² of piled raft foundations

CFA piling

  • Ø 300 mm

  • up to 12.5 m depth

  • Total Quantities: 539 number CFA piles

The Challenge

Broadoaks Park in West Byfleet is Octagon’s flagship development of luxury homes. Set in 25 acres of mature grounds the client required a foundation solution that was cost effective and time efficient so the desired programme could be achieved.

The Franki Solution

Alongside our client Octagon developments we selected our piled raft system because of various natural benefits to the Broadoaks site including speed of construction, reduced excavations and excellent incorporation of ground gas protective measures. Working alongside our suppliers we designed and installed our piled raft system inclusive of under raft venting system. 

Over multiple phases Franki Foundations UK have delivered in house piling and piled raft foundations on programme and hit key dates within our clients programme in order to keep the Broadoaks development rolling.

Project details

Project nameBroadoaks Park
LocationWest Byfleet United Kingdom
Building period2023 - 2023
CategoryHousing
Contract typeBuild
ClientOctagon Developments