• Execution into highly stratified layers of soil comprising very resistant layers
• As a single pile or as an element of a pile wall (tangent pile wall) à hypertext
• Infrastructure and industrial projects .
• Vibration-free execution
• Low noise execution
• Less removal of soil from the job site: in comparison with the PCS screw pile, there is less extraction of soil.
• A stable, dry and flat work platform is required.