The installation comprises 715 solar panels mounted across 3,700 square metres of rooftop space on the site’s logistics and equipment service buildings. With an installed capacity of 420 kWp, the system is expected to generate approximately 360 MWh of green electricity annually.
The energy produced will be consumed across the entire site: the office spaces, the adjacent workshop, and the electric vehicle charging stations on the main parking area.
This milestone highlights BESIX's ongoing efforts to implement smart energy solutions across its operations and to lead by example in the transition toward a more sustainable built environment.