Transforming a sandy expanse into a robust foundation capable of supporting a nuclear reactor is no small feat. BESIX’s work involved the excavation of 30 diaphragm walls, the installation of 162 steel pipes with anchoring shafts, and the drilling of 380 foundation piles to a depth of -47 NAP. Before this we also poured a underwater concrete floor of 1,5m thick. Every step of the process faced extraordinary challenges, from the stringent safety requirements of working on a nuclear site to preserving the delicate coastal environment surrounding the construction area. BESIX leveraged decades of expertise in engineering and construction to deliver a project that adheres to the highest quality and safety standards.
The PALLAS reactor is critical to global healthcare. With the aging High Flux Reactor (HFR) nearing the end of its operational life, the risk of disruption in the supply of medical isotopes looms large. These isotopes are instrumental in diagnosing and treating cancer, heart diseases, and other conditions. Recognizing this urgent need, the PALLAS initiative aims to ensure uninterrupted access to nuclear medicine for patients around the world. The reactor is designed to withstand even the most extreme conditions, underscoring the importance of robust foundations like those BESIX has now completed. This phase lays the groundwork for the next chapter of the reactor’s construction, ensuring it will remain a reliable source of medical isotopes for decades to come.
BESIX Nederland, alongside Franki Grondtechnieken, has been at the forefront of this landmark project since its inception. Our integrated approach combined BESIX’s mastery in concrete work with Franki’s specialization in complex foundation techniques. This collaboration exemplifies how diverse expertise can come together to achieve remarkable results. The project demanded meticulous coordination and continuous communication among all stakeholders, including PALLAS, BESIX, and subcontractors. Regular discussions fostered trust, mutual understanding, and a shared commitment to meeting the extraordinary standards required for a nuclear construction site.
Sietsche Eppinga, Construction Director PALLAS, praised BESIX Nederland’s contributions: "BESIX has been a reliable partner from the start, offering invaluable expertise. Their efforts ensured we are on track to provide vital nuclear medicine to patients in the future."
Read more about the project on the PALLAS website.